Made available to the public under the provisions of the Bureau of Indian Standards Act of 1986 and the Right to Information Act of 2005. In order to promote public education and public safety, equal justice for all, a better informed citizenry, the rule of law, world trade and world peace, this legal document is hereby made available on a noncommercial basis, as it is the right of all humans to know and speak the laws that govern them.
Division Name: Water Resources
Section Name: Measurement and Cost Analysis of Works For River Valley Projects (WRD 23)
Standard | Year | Title | IBR |
---|---|---|---|
IS 4851 (pdf) IS 4851 (txt) | 1987 | Proforma for Estimating Unit Rate of Concrete Used in Mechanized Construction of River Valley Projects | |
IS 4852 (pdf) IS 4852 (txt) | 1987 | Proforma for Estimating Unit Rate of Random Rubble Masonry Used in Construction of River Valley Projects | |
IS 9401-1 (pdf) IS 9401-1 (txt) | 1999 | Method of measurement of works in river valley projects (dams, appurtenant stru structures) : Part 1 Excavation for foundation | |
IS 9401-2 (pdf) IS 9401-2 (txt) | 2003 | Method of Measurement of Works in River Valley Projects (Dams and Appurtenant Structures), Part 2: Dewatering | |
IS 9401-3 (pdf) IS 9401-3 (txt) | 2003 | Method of Measurement of Works in River Valley Projects (Dams and Appurtenant Structures), Part 3: Grouting | |
IS 9401-4 (pdf) IS 9401-4 (txt) | 1980 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 4 Concrete work | |
IS 9401-5 (pdf) IS 9401-5 (txt) | 1980 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 5 Masonry | |
IS 9401-6 (pdf) IS 9401-6 (txt) | 1984 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 6 Ventilation pipes and other embedded materials | |
IS 9401-7 (pdf) IS 9401-7 (txt) | 1984 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 7 Joints | |
IS 9401-8 (pdf) IS 9401-8 (txt) | 1985 | Methods of measurement of works in river valley projects (dams and appurtenant structures): Part 8 Instrumentation | |
IS 9401-9 (pdf) | 1987 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 9 Lining | |
IS 9401-10 (pdf) | 1990 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 10 Form work | |
IS 9401-11 (pdf) IS 9401-11 (txt) | 1998 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 11 Diaphragm walls | |
IS 9401-12 (pdf) | 1992 | Method of measurement of works in river valley projects (dams and appurtenant structures): Part 12 Topographical surveys | |
IS 9401-13 (pdf) IS 9401-13 (txt) | 1992 | Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 13 Earth and fill dams | |
IS 9401-14 (pdf) IS 9401-14 (txt) | 1992 | Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 14 Canal works | |
IS 9401-15 (pdf) IS 9401-15 (txt) | 2010 | Method of Measurement of Works in River Valley Projects (Dams and Appurtenant Structures) Part 15 Investigation Works - Drilling of Bore Holes and Exploratory Drifting and Logging | |
IS 9401-16 (pdf) IS 9401-16 (txt) | 1999 | Method of Measurement of Works in River Valley Projects (Dams and Appurtenant Structures), Part 16: Tunneling | |
IS 9401-17 (pdf) IS 9401-17 (txt) | 1999 | Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 17 Hydromechanical and related metal works | |
IS 9401-18 (pdf) IS 9401-18 (txt) | 2000 | Method of Measurement of Work in River Valley Projects (Dams and Appurtenant Structures), Part 18: Sheet Piling | |
IS 9401-19 (pdf) IS 9401-19 (txt) | 2009 | Methods of Measurement of Works in River Valley Projects (Dams and Appurtenant Structures) Part 19 Electro-Mechanical Works | |
IS 10061 (pdf) IS 10061 (txt) | 1991 | Proforma for analysis of unit rate of excavation of tunnels by cyclic drilling and blasting | |
IS 10062 (pdf) | 1991 | Proforma for analysis of unit rate of quarrying rock by mechanical means | |
IS 10160 (pdf) IS 10160 (txt) | 1982 | Proforma for analysis of unit rate of earthwork used in construction of river valley projects | |
IS 10421 (pdf) IS 10421 (txt) | 1983 | Proforma for analysis of unit rate of shuttering/formwork for concrete items | |
IS 10777 (pdf) | 1994 | Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation | |
IS 11399-1 (pdf) IS 11399-1 (txt) | 1985 | Guidelines for estimating output norms of items of work in construction of river valley projects, Part 1: Earthwork excavation | |
IS 11590 (pdf) IS 11590 (txt) | 1995 | Guidelines for working out unit rate cost of the construction equipment used for river valley projects | |
IS 11638 (pdf) | 2000 | Proforma for Estimation of Unit Rate of Construction of Embankment by Mechanical Means | |
IS 13418 (pdf) | 1992 | Proforma for Analysis of Unit Rate of Grouting Used in River Valley Projects | |
IS 13419 (pdf) | 1992 | Proforma for analysis of unit rate of shotcreting/guniting used in river valley projects | |
IS 14590 (pdf) | 1998 | Proforma for analysis of unit rate of dewatering | |
IS 14749 (pdf) IS 14749 (txt) | 2000 | Proforma for Analysis of Unit Rate of Underground Excavation by Cyclic Drilling and Blasting | |
IS 14835 (pdf) IS 14835 (txt) | 2000 | Guidelines for Estimating Unit Rate of Items of Works in Construction of Rubble Masonry for River Valley Projects |
Last Updated: September 6, 2013
↑